The short answer
This electrical contractor script books estimates from homeowners who requested quotes and past customers inside the 540 day window. The opener names the inquiry, discovery covers the scope without diagnosing it, six objection responses handle price shopping and handyman comparisons, and the close books a specific estimate slot. Permit claims are true claims, never implied government mandates.
The script
Sample talk track. Fictional names. Adapt it to your offer and your rules.- Rep
Hi, is this [name]? This is [name] with [company], the electrical contractor. You requested an estimate for [panel upgrade / EV charger / rewire] on our site yesterday, so I am calling to get you on the schedule before the week fills. Do you have a minute?
- Prospect
Yeah, I filled that out.
- Rep
Great. Tell me what you have in mind in your own words: what is going on at the house?
- Prospect
I want a level 2 charger in the garage, and I think my panel might be old.
- Rep
A charger install is a common one for us, and we will look at the panel while we are there since the two are connected. I will not guess at your panel over the phone; the estimate visit is where we look, and the quote comes from what we actually find. Two quick things: is the garage attached, and do you know the panel's age or brand offhand?
- Prospect
Attached. No idea on the panel.
- Rep
No problem, that is exactly what the visit answers. The estimate runs about 30 minutes, we look at the garage run and the panel, and you get a written quote with the permit and inspection steps listed, because [your city] requires the permit on charger installs and we pull it as part of the job.
- Prospect
How much do these usually run?
- Rep
Honest answer: it depends on the panel and the run, and anyone who quotes you from this conversation is guessing. What I can tell you is that our quote is written, itemized, and the permit fee shows as its own line so you can compare bids fairly. Does the visit itself cost anything?
- Prospect
Does it?
- Rep
Not for this scope, and I will confirm that on the confirmation text so there are no surprises. I have tomorrow at 9 or Thursday at 3. Which works?
- Prospect
Thursday at 3.
- Rep
Thursday at 3. You will get a text from this number confirming, and if plans change just reply. Bring any questions you have about the charger brand too; we will answer what we know and tell you what depends on the site. Thanks [name].
Why the honest unknown wins
Homeowners collecting electrical bids hear three phone approaches: the fake range, the fear pitch about their old panel, and the fast-close pressure. This script wins by refusing all three. The opener rides the inquiry, discovery collects the scope in the homeowner’s own words, and the price question gets the most disarming answer in contracting: anyone who quotes from this conversation is guessing. The written itemized quote, with the permit as its own line, is the fairness story that beats the handyman bid and the national franchise alike.
The structure
The inquiry opener. Company, the scope they requested, and the schedule fact: the week fills. The inquiry is both the consent evidence and the reason the call feels expected.
Scope in their words. What is going on at the house, asked open-ended. The homeowner’s phrasing, the panel might be old, becomes the estimate’s agenda, and the rep adds no diagnosis over the phone.
Two sizing questions. Attached garage, panel age or brand, whatever the scope needs. Enough to prep the estimator, never enough to pretend a diagnosis happened.
The permit fact, true or absent. Where the jurisdiction requires a permit, the script names it plainly and lists it on the quote. Where it does not, the subject does not come up, because implying a government mandate is exactly what 16 CFR 461.3 prohibits.
The two-slot close. Morning or mid-afternoon slots, a no-cost visit confirmed in writing, and an invitation to bring brand questions.
Objection handling
“I’m getting a few quotes”
“Good, you should, and here is how to compare them fairly: ours is written, itemized, and the permit shows as its own line, so you can see what is materials, what is labor, and what the town charges. Bids that hide the permit inside a lump sum are hiding it for a reason.” The comparison framework converts a price shopper into a quality shopper.
“My neighbor’s guy said it’s a two hour job”
“Maybe, on his house, with his panel and his run. Ours is a written quote from your actual walls, and if the visit says two hours, the quote will reflect that. Estimates are free exactly because houses differ.” The neighbor anchor dissolves when the visit replaces the guess.
“Can you just tell me roughly?”
“Roughly is how change orders happen: the visit costs you nothing, takes 30 minutes, and the number you get is the number on the invoice. I would rather give you a real quote on Thursday than a fairy tale today.” The fairy-tale line lands with homeowners who have been burned; keep it, it is honest.
“I might do it myself”
“Some of it you legitimately can, and the parts you cannot are the ones the inspector cares about. Get the quote anyway: it costs nothing, and it tells you exactly what you would be taking on. If you do the DIY route, at least you priced it honestly.” Respect the DIY instinct and the quote still wins a share of them; fear tactics about DIY being illegal where it is not are an Impersonation-Rule-adjacent lie.
“How did you get my number?”
“From the estimate request form you submitted on our site yesterday.” Sourcing clarity is the whole answer. The inquiry is the record; if the homeowner disputes it, apologize for the crossed wires and log the outcome.
“Just text me a price”
“A texted price is the guess I mentioned, and it is also the number another contractor gets to beat with a worse job. The written quote after the visit is the honest version, and Thursday at 3 gets it to you by Friday.” Text the confirmation and the visit checklist, not a price.
Voicemail, 20 seconds
“Hi [name], [name] with [company] about the estimate you requested for [scope]. This week’s slots are going; I have Thursday at 3 and tomorrow at 9. I will try you tomorrow morning, or text this number back.” Scope, slots, text path. No price hints, no permit scare talk, no false urgency. Log it so the next attempt changes daypart.
After the call
The AI summary should carry the scope in the homeowner’s words, the sizing facts, the estimate slot, and the confirmation send. Dispositions match the trade: estimate booked, quote follow-up, permit question, financing discussion, not a fit, unreachable, left voicemail, do not call. Quote follow-ups are dated to the homeowner’s decision window, because the quote that calls back once at the right moment beats the one that nags weekly.
What the estimator needs before Thursday
The visit goes better when the homeowner brings three facts: the panel’s location if known, access to the garage or work area, and any photos they already took of the panel label. The confirmation text lists exactly that, nothing more, because long prep lists read as homework and depress show rates. The estimator walks in with the scope in the homeowner’s own words from the call summary, which is why the summary’s fields matter; a quote conversation that starts from the homeowner’s own description starts halfway to a signature.
Compliance in one paragraph
A purchase within 540 days or an inquiry within 90 days creates an established business relationship under 16 CFR 310.2, which covers estimate follow-ups and past-customer calls; marketing beyond that requires National DNC compliance, 8 a.m. to 9 p.m. local hours under 16 CFR 310.4(c), and immediate opt-out honoring. The consent definition for wireless marketing sits at 47 CFR 64.1200(f); the 2024 one-to-one consent rule was vacated in January 2025 and is not current law. Permit claims must match the jurisdiction’s actual requirements, and 16 CFR 461.3 bars implying government affiliation or mandates. Several states require all-party recording consent; use a disclosure. DialBreeze enforces your internal DNC list, quiet hours and attempt caps. This guide describes rules, not legal advice.
FAQ
Why does the script refuse to quote ranges on the phone?
How are permit questions handled?
What does the discovery need to establish?
What consent applies to calling an inquiry lead?
Do these calls need recording disclosures?
Sources
- ecfr.gov /current/title-16/chapter-I/subchapter-C/part-310/section-310.2
- ecfr.gov /current/title-16/chapter-I/subchapter-C/part-461/section-461.3
- ftc.gov /business-guidance/resources/complying-telemarketing-sales-rule
Operational guidance, not legal advice. Rules vary by state and by campaign.